Gravity & Lateral Systems – Engineered full wood-framed gravity and lateral systems, including load analysis and design of bearing walls, headers, posts, roof and floor trusses, stairs, and footings. Lateral system design featured shear walls, diaphragm connections, drag struts, ties, and anchorage. Designed gravity and lateral systems for the porte-cochere entry structure, integrating seamlessly with the main building.
Framing & Foundation Design – Developed foundation plans and details for pad and continuous footings to support the full vertical and lateral loads. Produced structural framing plans and lateral diagrams for each hotel level, including second through fifth floors and the roof.
Comprehensive Structural Documentation – Delivered a full set of structural drawings, including plan views, specifications, structural sections, framing details, and lateral system layouts. Coordination with architectural and structural base files in AutoCAD format ensured accurate integration with the broader design team.
Mechanical Design – Collaborated with Caliber Mechanical Design to design HVAC systems using PTAC units in guest rooms and split systems for common areas. Plans included equipment layout, ductwork, roof-mounted unit placement, and roof penetrations. Provided mechanical specifications and Title-24 energy calculations. Participated in LEED point estimation using the 2009 LEED for New Construction checklist.
Plumbing Design – Developed plumbing layouts for domestic water, hot water recirculation, sewer, natural gas, and condensate drainage. Coordinated with civil engineers for utility tie-ins within 5 feet of the building and detailed roof drainage and plumbing isometrics. Selected appropriate water heating systems for guestrooms and laundry facilities. Assisted with LEED plumbing credit documentation.
Electrical Design – Produced site and building electrical plans including power distribution, site lighting, photometric studies, lighting and communication layouts, and underground dry utility routing. Coordinated trenching requirements and Title-24 compliance documentation.
Our team provided engineering support through all project phases including design, permitting, and construction. Our team submitted 75% and 100% plan sets for constructability and plan check, including wet-stamped sets and electronic DWG files. We responded to plan check comments, coordinated backcheck submittals, and participated in consultant meetings and design coordination sessions. Construction administration included RFI responses, submittal reviews, and coordination with inspectors.
This project demonstrates Zeltmacher’s comprehensive multi-discipline capabilities and experience in delivering efficient, code-compliant hospitality projects through close collaboration, detailed documentation, and proactive project management.
Zeltmacher Structural Engineering provided complete structural, mechanical, electrical, and plumbing (MEP) design services for a new five-story hotel in Visalia, California. Coordinated by Prime Group Construction, Inc., the ±60,000 square foot project includes 104 guest rooms and utilizes a wood-framed structural system. The hotel design incorporates a porte-cochere entry and is supported by a slab-on-grade foundation system.